Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many no of cement bags required for 1:4 plastering for
100 sqft?
how many no of cement bags required for 1:3 plastering for
ceiling for 100 sqft?

Answer Posted / prashanth kumar

MATERIAL REQUIRED FOR PLASTERING 100 SQUARE FEET OF CEILING WITH 12MM THICKNESS IN CM(1:3) IS 1.2 BAGS OF CEMENT AND IN CM(1:4) IS 1 BAG OF CEMENT

Is This Answer Correct ?    8 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What expenses counted in contingencies and how much it is in related to built-up area of the building.

1730


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1886


Which is the best book for building construction?

1063


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

3046


how to calibrate the RM 800

2333


what are the code used for residental building?

2479


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2212


What is oneside mat. And explain 

2530


Define What is the tallest man made structure in the world?

1179


what is work of planning deptt. in any construction compny (in road project)

2400


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1840


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1767


What is the procedure of concealed plumbing in toilets?

2292


Which are the Steel tests ?

1191


length where bent up is made in slab of bridge from one end

1875