The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me
Answer Posted / unnu
Once the first floor slab is set , you can give support for the 2nd floor slab. Nothing is going to give away.FF slab will be already supported by columns
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Exterior Joints,define
pls tell me about method of cutting length of ties column
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
What is the use of water table & Kreb stone for drain
How to design staircase.plz tell me formula for the design the staircase.
what is the exact dia of 8swg and 10swg gabion wire
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What are the techniques to measure road difference?
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is the theoritical percentage of concrete cubes testing per day?
Please design 12.5m long dubbly beam
Will water damage concrete?