WHERE IS THE LIGHTING ARRESTER SHOULD BE PLACED IN
DISTRIBUTION LINES?
Answer Posted / sanjna singh
LIGHTNING ARRESTER IS PLACED ON THE TOP OF DISTRIBUTION POLE..
WHEN THERE IS LIGHTNING IN SKY IT EFFECTED DISTRIBUTION LINE THEN THE ARRESTER CAPTURE IT AND GROUND THROUGH THE POLE........
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the different methodes for calculating the short circuit Current?
what kind of quetions will ask in BHEL in interview? Plz help me?
In a carnot engine with an efficiency of 40%, the heat rejected to the sink at 27 C is 60 kJ, then the heat supplied in kJ to the engine by the sources is
i have done diploma and btech in EE and live in Chandigarh so kindly help me how can i make my competency certificate in my area.
i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice
what is the voltage between earth & neutral in 3 phase electrical connection.
what is difference between line differential and transformer differential?
What is difference between unity power factor wattmeter and upper power factor wattmeter? In short circuit test of transformer the wattmeter used is unity power factor type or upper power factor type wattmeter?
can a 150 kva 3 phase 440v/230V delta-wye step down transformer can be use as step up transfoermer with connected loads at 440v side?
im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar
What will happend if given Vfd out put to step up transformer
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
What is state space method ? Why its used ? Can it applicable on linear, non-linear, 1st order, higher order, homogeneous, non-homogeneous, open-loop , closed loops , stable & unstable systems ?
Define demand factor?
1.what is the reason for transformer and lightning arrester blast in 33kv system