Why we provide chair for slab reinforcement? How to place chair distributors to distributors or top distributors to bottom main?
Answer Posted / arvind rai
Basically Chairs is provided in slab and flooring work for maintain spacing in top layer jaali & bottom layer jalli for avoiding of collapse of bar when castion work is start.
| Is This Answer Correct ? | 19 Yes | 3 No |
Post New Answer View All Answers
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
cause of cylinder test failure
What is the strongest bridge for a school contest?
Material calculation of cm 1:6 for 1sqm
what is the minimum cement content for M20 & M25 as per is code -456(2000).
What out turn civil works
undistributed samples are obtained by
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Which purpose we use deck anchor in bridges?
Sir how to find cutting length for footing steel bars in the shape of "u"
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Why joints are provided?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
Design a rectangular channel.