Why we provide chair for slab reinforcement? How to place chair distributors to distributors or top distributors to bottom main?
Answer Posted / arvind rai
Basically Chairs is provided in slab and flooring work for maintain spacing in top layer jaali & bottom layer jalli for avoiding of collapse of bar when castion work is start.
| Is This Answer Correct ? | 19 Yes | 3 No |
Post New Answer View All Answers
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what is the calculation of raw material for 0.35cum of m-15
Which type of plywood & sizes using in construction projects ?
what do you know that m20,m25
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
How to do base isolation using ETABS software?
In Rcc ratio calculation I wanted to know quantity of Steel also.
How can explode a block?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
I need model question papers for writing the Dubai municipality exam,for G+1
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
How to decide/consider the grade of bitumen for dbm.
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.