a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / manish
a) Column size= 250*400,
so, L=250, B=400, cover = 40mm, bar dia 8mm
Cutting length of stirrups
= 2(L+B)-(8*cover)+(2*10d)-(1.5d*nos of bends)
(2*10d) is for 2hooks,
1.5d is deduction for elongation at each bend
Calculation =2*(250+400)-(8*40)+(2*10*8)-(1.5*8*5)
Cut length= 1080 mm.
| Is This Answer Correct ? | 48 Yes | 19 No |
Post New Answer View All Answers
How much cement and sand required for 9"brick wall per square metre
Please let me know what is the simplest way of Calculating Mix Designs
natucher of concrete &type of concrete?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
what is the maximum number of course that can be laid according to IS code and the max height.
how to find out hard strata in bored pile when the DMC method adopted.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Doul Bar reinforcement and details of drawing.
how to convert sand in Cft to Kgs
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What was asked in isro civil interview
VAT and CST ? Which benefits for buyer ? Why benefits?
How to get MEP technical,instaaltion & testing data for interview?
Concrete cover for slab, column, beam and footing?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel