Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Which construction joint is much better ?
either vertical or horizontal?

Answer Posted / shaikh sayeed

Construction Joints should be minimum in execution. and the
location is to be decided carefully. Constr. Joint should be
at right angle to the span of member. e.g horizontal in
vertical columns and vertical in horizontal beams. Flexural
Strength of member due to construction joints depends upon
prepration of surface before making a joint, location of
joint. ref: Design and contruction of joints in concrete
structure, M.N Bussel

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the crank length in the slab?

1123


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

2076


for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

2237


What is the absolute pressure scale?

1205


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

2376


I am called for interview from north east power plant .so, I need some interview question which may help me.

1842


very simple or less time consuming formula for reinforcement calculation by moment

1521


how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm

2170


What are the causes of building collapse?

1213


Explain the different types of building contracts?

1161


Which brick is best for construction ,either fly ash or AAC BLOCKS

1049


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1853


Explain what is zoning permit?

1379


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1728


it is a corrected question." make a list of engineering property(properties) of soil.

2064