For testing 33kv cable hipot testing. How much kv we have to
Apply .Give in details.
Answer Posted / yousaf
D.C. voltage equal to 3 x U0 shall be applied for 15 minutes. The standard is 1EC5840.
57KV FOR 15 MIN.
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
please tell me how a surge protector work on a DC 48Volt.? please describe briefly.
how does WTI work ?
How to measure the earth resistance value in a concrete pavement(flood light area)?
what is the differance between HT motors And LT MOTORS.
how oltc works in rectiformers of higher rating (27 mva,200v dc,120kamps) please provide me full information with diaggram.
What is the difference between Static and servo controlled voltage stablizer?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
block diagram of 2 ups system connected in hot stand by mode?
what material is the electrical housing wire made of? is there any difference for the telephone lines?
HOW WE CHOOSE EARTH'S POTENTIAL AS ZERO V?
Two bulbs of 100w and 40w respectively connected in series across a 230v supply which bulb will glow bright and why?
what is the cause of voltage dipp or swell in the transmission lines?
how many stairs have you climbed while you were coming
What is the ratio of Booster transformer?
list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.