Quick setting cement's setting time?
Answer Posted / udhaykumar
Quick setting cement : - In the cement, the initial setting time is starting from 5 mnts & also 30 mnts (final setting time) will change to hard state..
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how many type of admixtures for water stored structure?
The foundations are placed below ground level, to increase?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Explain the mechanism of cavitations in pipes and drains?
How to build the floor to ceiling bookcase?
How can you distinguish between sorption, absorption and adsorption?
What is the tensile strength of wood?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
When column of building is abutting the boundary line,then suitable footing advised is
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
Under what circumstances should pot bearings be used instead of elastomeric bearings?
types of survey and levelling instrument ?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.