Answer Posted / guest
It is the key use to define the Pp process like scheduling,
automatic functions , CApacity planning. And use for
converting planned order to production or process order.
maintain in WS view.
Is This Answer Correct ? | 12 Yes | 4 No |
Post New Answer View All Answers
Are there any reports in sap to list of material requirement from ltp ?
Have you used Pull list or back flushing in REM?
What are traffic lights in mrp?
what do you mean by opening periods
Difference between different strategy groups.
What are all the steps involved in Variant Configuration?
What are the levels of batch, explain batch determination process?
What are the types of MIC?
Mention what is the t-code for changing production order and to display production order?
What is standard order type
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Can we create production order without bom and routing ?
What is meant by payscale structure? How did you configure payscale structure?
Explain what happens to planned after it has been converted into production order?