why we have to particulary use ACB for below ratings,even
available of MCB,MCCB with that range ?
Answer Posted / sheikh
ACB would be installed as a main feeder in a large
distribution and having multiple safeties as compare to MCCB
ACB can be operated with remote etc...
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
How to select the earthing transformer,for DELTA TO DELTA TRANSFORMER OR ALTERNATOR SIDE.Pls post your answers and calculation.
How many methods use the load flow solution?
The slip during plugging operation is given by= A 1-s B 2+s C 1+s D 2-s
What is the vector group of a transformer,how can it be found out?
work of choke in florocent tube circuit ?
Can anybody please refer the best and simple book for about Protection relays and in detail of all its protection ?
difference between high and low impedance BUS BAR relay??
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
why effective resistance should be more than static resistance in transmission line?
EXPLAIN USE OF ROCKING ARRANGEMENT IN ELECTRIC HEATING?
ho can we calculate the conductor insulation value according to their ratings like voltage,current etc.how insulation value related with voltage,current and power of amachine
how to setting voltage RTCC panel
if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
what is ramping rate of generator