Answer Posted / nandagopan
This is found in telecom area.most of the phone wires are
copper.its almost exposed to atmosphere,sand and corrode
producing copper oxide this is why copper act as positively
charged ion to act with negatively charged oxygen.so a wire
with a positively charged accelerates corrosion.to slow down
the positive is grounded to give a negative charge.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
my b-tech percentage is 50%. what answer will satisfy the hr ?
1. What is maximum permissible distance between smoke detectors ? 2. How do we decide number of smoke detectors required in a large office, warehouse, hall etc ? 3. What should be maximum height of smoke detectors ? 4. Where do we use heat detector, optical smoke detector, temperature sensitive detector ?
What is core CT & it's function?
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
what is mathed of check the D.C MOTOR 181 KW (ARMATURE AND FIELD) WHAT IS THE MATHED OF CHECK THE THYRISTOR MODULE (HIGH CURRENT)
What is Phase margin?
Why can't we parallel Voltage transformer secondary circuits?
What is the difference between UPS & inverter ? which UPS is better and whos got the edge ? what is the difference between & inverter ? which UPS is better and whos got the edge 12 V , 24 V , 36 V etc what are the advantages of 12 V, 24 V , 36 V etc and what are the disadvantages of 12 V, 24 V, 36 V etc thanks
Define conversion efficiency of a power amplifier.
why don't we use the generator as a motor? and what will happen?
What is the two pole structure?
what is load despatching
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?