Quick setting cement's setting time?
Answer Posted / balamurugan
Intial setting time 5-30 min. Final setting time 10 hours.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is portland cement
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
What is the difference between 53 grade and 43 grade cement
What are the reasons for geotechnical site investigations in uganda?
what is called the inverd level of mabhole chamber?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
how to compute slab reinforcements on step by step procedures??
In cement concrete how to check a quality of material also proportion of material at site ?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
how many litres of enamel paint required for 5000 sft of site??
What are the benefits of rcc pipes over steel designed pipes?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem