What is the procedure of changing a Faulty Module of Allen
Bradley PlC without stopping the Process

Answer Posted / carl_ellis

The situation is not unique to Allen Bradley; many
controller brands have I/O modules that can be replaced
without powering down the controller which might require
stopping the process.

The marketing term is the acronymn RIUP, Removal and
Insertion Under Power

The guys in the shop call it, "hot swap", hot meaning "while
powered", swap meaning to change out.

RIUP (Removal and Insertion Under) means that while the rack
is powered, any of the I/O Modules can be removed or inserted:
• With no physical damage to the module, to the rack, or to
other modules in the rack
• Without disturbing the functions of other I/O modules in
the rack or in the system.

It does not mean that the process will not be disturbed.

If an I/O card needs to be changed out under power, it means
that something is wrong with the I/O card and the process
has already been disturbed.

Under carefully controlled circumstances, this feature
enables the user to remove and insert an I/O module
without completely shutting down a running system. However,
it must be recognized that removing or
inserting an I/O module under power is potentially hazardous
to property and to personnel.

Circumstances that dictate prudent actions depend on
conditions and specific process applications at each
user facility. It is the responsibility of site personnel
to know all potential consequences of RIUP, and to
take actions to prevent all adverse consequences before
removing or inserting an I/O module under power.

Each plant or installation needs to develop guidelines for
establishing appropriate 'hot swap' procedures because

a) there are potentially lethal voltages on Terminal Boards
associated with I/O Modules.

b) each signal at each of the terminals for an I/O module
has a specific function. Any or all of the signals may be
vital for safely controlling a process.

Carl Ellis
Measure First

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please send me the sample question of Instrumentation of hpcl/iocl exam. my mail id hihi_kiholo@rediffmail.com

2696


Calibration procedure for Electro magnetic Flow meter

4034


PLEASE PROVIDE SAMPLES OF CHEVRON SKILL TESTS

3459


how 3 out of 2 Logic/interlocks works? give brief explanation with help of diagram.

1840


describe flow nozzel principle?

2075






what would be the minimum flow rate that we can measure on rotameter..?

1623


whats the abbreviation of IOP? is it instrument of power or input open problem?

660


Area classification, Equipments, Gas groups, temperature classification, Ingress protection, Fire Extinguishers.

1495


why orfice is not used for main steam flow calculation

1601


Draw a P& ID showing – orifice flange, plate, dp transmitter, isolation & bypass valves and tubing.

1498


Why 4-20 amps is being used in instruments? Why cant we use any other range instead of 4-20 amps? Why only 4 amps is taken as lower limit and why 20 amps is taken as the higher limit?

1050


how many types of viberation transmitter and how to calibrate and where use of vibration transmitter

1687


How many types of sensor

1153


Derive capacitance to 4-20ma conversion formula / relation in capacitance type pressure sensor?

1763


what is the reset offset and control system in instrumentation

3114