Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Number of cement bags required for concreting 1000 square
Feet slab of 4 inch thickness.

Answer Posted / raghav gowda

for 1000sqft slab of 4" thk.
assume for M20 grade of 350kg cement for 1cum of concrete is
first convert the 4" thk to feet i,e 4/12= 0.333'
then, 1000x0.333= 333cft
convert 333cft to cmt i e, 333/35.28=9.438
for 9.438cmt of concrete cement required is 9.438x350=3303.3kg
then convert it in to bags
3303.3/50=66.066bags
so the cement reqired is 66.066bags.

Is This Answer Correct ?    67 Yes 27 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do we determine the specific gravity of a cement?

1129


Explain major difference between auto level and dumpy level?

1207


What in your past experience or education prepares you for the position for which you are applying

2229


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2485


What are the basic use of runners and standards of pipelines?

1235


WHAT DLC DESIGN IN CONSTRUCTION

2091


What is the outturn of Ceiling plastering

3397


What is structural frames or systems?

1167


hi guys what happens if you are absent for a supplymentry exam?

1842


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3824


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

1197


RR masonry rate analysis

3364


Sir how to find cutting length for footing steel bars in the shape of "u"

1779


The 4 main factors to start a construction project are––

2293


pls mail some more tecnical qustions at msaranya2610@gmail.com

2112