WE HAVE A PROBLEM THAT THE MAIN DRIVE OF OUR CEMENT MILL HAS
AN EARTHING PROBLEM?TWO OF STATOR WINDINGS INSULATION HAS
BEEN COLLAPSED DUE TO AGING PROBLEM.THE PHASES HAVE BEEN
BYPASSED AND NOW THE LOAD HAS BEEN INCREASED.WE CAN'T
REPLACE THE MOTOR.KINDLY HELP ME BY GIVING SUGGESTION THAT
HOW TO MAINTAIN THE STARTING TORQUE AND CURRENT FOR HIGH
LOADS.
Answer Posted / gaurav
WE ARE THINKING OF INCREASING THE CAPACITY OF BARRING DRIVE
AND MOREOVER WE ARE THINKING OF INSTALLING GRR AS WELL WILL IT
HELP?
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are merits & De-merits of State-Space Method? What is series programming, parallel programming, general programming & direct programming ? And, difference between these programmings Techniques ?
What is expention fastener (Fan)
why the field winding in dc motor is not short circuited eventhough dc supply is applied across the winding
why we used ZNO in Lightning arrester.
Tell me all plants load factors i.e which plant operating on which load?
Salient pole alternator is more stable, why?
what is difference between earthingpits,earthing grid & earthing mess?
How can we convert 11 kv to 440 volt without using transformer ?
what is a synchronizing lamp ?
why different series of vfds (like allenbradley)are used in industry ?
WHY BLADE & JOW OF ISOLETOR IN SUBSTATION?
how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.
How to Decide the Location of Earth pit for Compressor in Oil Depo? and How to measure the resistance of earth pit Pls explain me with the help of Circuit Diagram?
hello!my name is sheikh iam preparing for indian engineering servieces,please send me the old question papers..to sheikhshaazforjobs@gmail.com
what are the ''pitting rings''and how cn they be controlled in a series generator