How many number of reject links merge stage can have?
Answer Posted / sravanthi agarwal
The no. of reject links in merge stage should be equal to
the no. of update links we gave as a input to merge stage
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How rejected rows are managed in datastage?
What are the different layers in the information server architecture?
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
Explaine the implimentation of scd's in ds indetail, please send me step by step procedure to perform scd's 1,2,3. Please replay for this, Thanks in advance
What is developer responsibilities in UAT (user acceptance testing and Post implementation phase?
What is meta stage?
Describe the main features of datastage?
how to write server Routine coding?
8000 jobs r there i given commit, suddenly job will abort? what happens? 2)diff b/t transformer stage & filter stage? 3)how to load the data in the source?
What are the partitioning techniques available in link partitioner?
im new to this tool im now at project plz tell me step by step process how to design plz help me i wnt to go with exp for job plz give me d proper design and explination
Can you highlight the main features of ibm infosphere information server?
Define ds designer?
What is the difference between Datastage 7.5 and 7.0?