How many number of reject links merge stage can have?
Answer Posted / sravanthi agarwal
The no. of reject links in merge stage should be equal to
the no. of update links we gave as a input to merge stage
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
How do you register plug-ins?
if i have two tables table1 table2 1a 1a,b,c,d 1b 2a,b,c,d,e 1c 1d 2a 2b 2c 2d 2e how can i get data as same as in tables? how can i implement scd typ1 and type2 in both server and in parallel? field1 field2 field3 suresh , 10,324 , 355 , 1234 ram , 23,456 , 450 , 456 balu ,40,346,23 , 275, 5678 how to remove the duplicate rows,inthe fields?
how can we create rank using datastage?what is the meaning of rank?
What are the job parameters?
What is the different type of jobs in datastage?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
What is difference between server jobs & parallel jobs?
What is process model?
why do u need the IOS upgradation in a FC switch
Which commands are used to import and export the datastage jobs?
What all the types of jobs you developed?
What is the difference between hashfile and sequential file?
What is the flow of loading data into fact & dimensional tables?
how to write server Routine coding?