How to calculate the ups battery back up? give the formula.
Answer Posted / narayanarao.s
back up( in hours)= system dc volts x AH rating(
battery)/kva(load)x system power factor.
Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
why the check zone and main zone are used for Busbar Protn. scheem?
why we used dc supply for field in dg set
how indusrial diesel generator work
how was your last weekend.
What is power factor why we should maintain the power factor unless what will happen
CBCT selection
Why are the cores of large transformers built up of circular transactions ?
explain the types of drives
Which cable is use for rtcc control panel
at what basis/standard we have to arrive the current density of aluminium/ copper in busbar?
difference between the applicability of nortons and thevenin theorem
What is transformation ratio what it describes?
how to calculate units consumption for a 12 hp motor /hr.
In 11/0.414 KV Parralel supply network with Bus tie closed what will be the fault level is it doubled or halved??