How to calculate the ups battery back up? give the formula.

Answer Posted / narayanarao.s

back up( in hours)= system dc volts x AH rating(
battery)/kva(load)x system power factor.

Is This Answer Correct ?    11 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.

1592


why the check zone and main zone are used for Busbar Protn. scheem?

1657


why we used dc supply for field in dg set

1911


how indusrial diesel generator work

1451


how was your last weekend.

1329






What is power factor why we should maintain the power factor unless what will happen

1251


CBCT selection

1788


Why are the cores of large transformers built up of circular transactions ?

1552


explain the types of drives

1549


Which cable is use for rtcc control panel

1330


at what basis/standard we have to arrive the current density of aluminium/ copper in busbar?

1654


difference between the applicability of nortons and thevenin theorem

1545


What is transformation ratio what it describes?

1162


how to calculate units consumption for a 12 hp motor /hr.

1027


In 11/0.414 KV Parralel supply network with Bus tie closed what will be the fault level is it doubled or halved??

1628