Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Number of cement bags required for concreting 1000 square
Feet slab of 4 inch thickness.

Answer Posted / mohammedazhar uddin

for the grade m20 the cement per 1cum is 320kg
so the quantity is calculate in this manner
1000*4"=9.42 cum
then 9.42*320=3014kg 1bag= 50kg than
3014/50=60.2bags

Is This Answer Correct ?    88 Yes 35 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

3340


What is meant by cartesian coordinate system?

1156


How many bricks are there in 100cft?

1258


How to take labor charges for construction of 1cum of concrete?

1160


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1987


For the construction project what capital cost has to be taken in consideration?

1142


Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

1440


why do we provide haunches in rcc box or underpasses?

3005


What will you do if you encounter problems like accidents?

995


In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?

2500


how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches

1626


I have an span length 16 ft c/c

1457


Why the finite element method is lower bound solution?

2960


what is meant by csr in foundation? what is sbc?what is meant by contour line?

2362


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2445