1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / suvankar mitra
14
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to do rate analysis for concrete work including shuttering work?
Please design 12.5m long dubbly beam
What is Gsb tollens ?
Minimum and maximum size of the building components
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
What are the phases inspections are done by local authority while construction?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
Explain the Strength of brick?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
How can we make a hole in a solid rectangle using solidsworks?
How many Sft of Level Plaster per Kg
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
what is idealized curve for concrere and steel