Number of cement bags required for concreting 1000 square
Feet slab of 4 inch thickness.

Answer Posted / ashwini

If the grade of concrete is M25 and 330 KG cement per cubic
meter of concrete. Then the answer is 61.31 bags of cement
is required.

Is This Answer Correct ?    39 Yes 26 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how we can find sieve #4 is 4.75mm?

1871


five requirements of infill panels for walls?

3273


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

1929


Define What is rigging?

623


what is right & short method of measurement of slab&beam

1576






Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1272


how to calculate total cost for slab 35'×8'

1506


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2257


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1062


What is alternate bid?

709


how to compute slab reinforcements on step by step procedures??

4953


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1482


how to tie 10 legged stirrups

5883


what is moment-curvature relationship in semi rigid connections??

1655


Discuss some applications of modular elasticity?

751