How many cement mortor dry quantity required for 1m3 ?(1:4)

Answer Posted / uttam sasavade

1.6 m3 Dry qty. required for 1 M3.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

1628


Define What is the difference between routing maintenance and major maintenance in school facilities?

741


Which purpose we use deck anchor in bridges?

640


How much percentage of brick bats allowed in CD-75 bricks

1882


For Wet Mix Mecadam design what is Optimum moisture content

1614






Spider cracks occur in beam bottom due to––

1649


Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?

1431


Explain how you can turn off the display for dimension in CAD?

715


I need model question papers for writing the Dubai municipality exam,for G+1

9388


what does the grad of cement shows (denotes)?

1145


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1663


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1459


Define What is the meaning of a blue land surveyors flag?

759


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1205


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1957