Answer Posted / k.l.b.srinivas
BEFORE STARTING PLASTERING WORK IF ANY CONCRETE ELEMENTS
LIKE COLUMNS,WALLS ETC. WE HAVE TO DO POINTING / HACKING.
ALL THE SURFACES WHERE PLASTERING IS TO BE DONE SHOULD BE
WET BY APPLYING WATER. AT THE JOINTS GROOVES SHOULD BE
MAINTAINED TO AVOID CRACKS. PROPORTION OF MIXING SHOULD BE
PROPER.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
how i convert mm into standard wire guage (SWG)no.
What is need for setting limits?
brickwork labour rate per cum ?
what is pqc
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
what is Brest Wall?
will fix foundation bolts at site with out template is there any procedure?
what are the challenges of being a team leader and a supervisor?
When column of building is abutting the boundary line,then suitable footing advised is
Who designed the city of washington dc?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
types of piles detail,