Answer Posted / k.l.b.srinivas
BEFORE STARTING PLASTERING WORK IF ANY CONCRETE ELEMENTS
LIKE COLUMNS,WALLS ETC. WE HAVE TO DO POINTING / HACKING.
ALL THE SURFACES WHERE PLASTERING IS TO BE DONE SHOULD BE
WET BY APPLYING WATER. AT THE JOINTS GROOVES SHOULD BE
MAINTAINED TO AVOID CRACKS. PROPORTION OF MIXING SHOULD BE
PROPER.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
material used for mendrel use to bend epoxy coated rebar
Explain the difference between shear and tensile strength.
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
What in bending moment, if a moment is free end of cantilever beam?
In case if concrete box girder bridges how is the number of cells determined?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What is the cost difference between site mix and ready mix concrete per cubic meter
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What are your goals?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr