how much steel required for 1 square meter slab?
Answer Posted / manthri ramu
It is based on the type of structure. It is 25 kg/smt for medium reinforced structure and 50kg/smt for commercial complexes.
| Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
What was asked in isro civil interview
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
how to workable concrete cube test M-25 design mix
What is the per cu. mt. price of ready mix in Gujarat region.?
How high should the water tank be to provide a 60 psi at base of this water tower?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
How to come 1.54 from dry to wet concrete?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is braced excavation all about?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what are the values of compressieve strenght?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Which is stronger solid steel rod or hollow steel pipe?