Used Cement Mortar, Cement & Sand in 1 Square Meter or 1
Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
Answer Posted / uttam sasavade
If 1:4 Plaster Qty for 100 M2
= Wet Volume of Material 100 m2 x 0.018= 1.80 m3
= Dry Volume consider 25 % extra= 1.80 m3 x 1.25 = 2.25 m3
required.
1/5 =0.200 * 1.25= 0.25 / 0.0347bag= 7.204 bag req. for 1 m3
Cement required for 2.25 m3 x 7.204 bag= 16.209 bag.
Qty. required for 1 m2= 16.206 /100 = 0.16 bag
Sand 4/5= 0.8 * 1.25= 1 m3 x 2.25 m3 =2.25 m3 /100
sand Required for 1 m2 plaster 0.0225 M3
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
What is diversion tunnel in a dam?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
what is stressing
Technical Question of Civil Engineering
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
TELL ME THE EQUATION FOR OGEE SPILLWAY
What is the biggest dam in america?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
What is the use of offset command?
Basic civil interview questions
Which Types Of Bricks ?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon