Used Cement Mortar, Cement & Sand in 1 Square Meter or 1
Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
Answer Posted / uttam sasavade
If 1:4 Plaster Qty for 100 M2
= Wet Volume of Material 100 m2 x 0.018= 1.80 m3
= Dry Volume consider 25 % extra= 1.80 m3 x 1.25 = 2.25 m3
required.
1/5 =0.200 * 1.25= 0.25 / 0.0347bag= 7.204 bag req. for 1 m3
Cement required for 2.25 m3 x 7.204 bag= 16.209 bag.
Qty. required for 1 m2= 16.206 /100 = 0.16 bag
Sand 4/5= 0.8 * 1.25= 1 m3 x 2.25 m3 =2.25 m3 /100
sand Required for 1 m2 plaster 0.0225 M3
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
How to decide/consider the grade of bitumen for dbm.
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
how we check the thickness and line of ceiling plaster.
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Define Who designed the city of Washington DC?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Which ratio use for cement selery???
What is the different type of slump test indications?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
Form where IS456 is adopted in 1978?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
For what purpose bedding is used under storm water drains, explain?