Hai..,in datastage how to explain project in
interview?please explain any domain please.
Answer Posted / ram y
first tell about
project name
client
team size
duration of project
r&r details
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
How do y read Sequential file from job control?
i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS
On which interface you will be working as a developer?
Give an idea of system variables.
DB2 connector> transformer > sequential file Data will be exported into a csv format in a sequential file. This file will be send in a email using a sequence job. Problem here is, how to avoid sending a blank csv file? When I ran the job there are chances that it might return zero records but in the sequence job csv file is going blank. how can I avoid this? thanks
Could anyone give brief explanation bout datastage admin
What are sequencers?
What is the difference between datastage and informatica?
What is apt_config in datastage?
What are the some differences between 7.x and 8.x version of datastage?
Differentiate between validated and Compiled in the Datastage?
What is the use of datastage designer?
How to perform incremental load in datastage?
What are the steps needed to create a simple basic datastage job?
Does datastage support slowly changing dimensions ?