Answer Posted / rajkumar
.45 TO 0.6 DEPEND UPON THE MIX DESIGN
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Who built the sears tower?
What is the strength of 1:6:12 mix?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
Aptitude, reasoning, quants, verbal and technical question
How do you maintain water pressure?
mix design procedure for 1:6 cement mortar
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
What is the meaning of soil reinforcement?
Basic civil interview questionsÂ
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)