what is the thikness of binding wire
please quick response
Answer Posted / sid
18-28 Gage
1-1.5 mm dia
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What is the difference between chamfer and fillet?
how many BSCs can i connect to the HUAWEI MSC
How many pyramid in egypt?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What should be the standard roof height like to be?
What quantity of 1.0 m3 bricks required?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
What are the different types of foundation?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
how to calculate the strength of rebound hammer test reading in building construction ?
What is change order request?
How to do rate analysis for concrete work including shuttering work?