Answer Posted / abdullah
if structure is rcc then cement will be 380 kg . means no of
bag is 7.6.
for pcc then cement will be 360kg. means no. of bag is 7.1.
according to this u can find the quantity of water
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
What are the main reasons for conducting pull-out tests for soil nails?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
water leak detection system question & answer
pls tell me about method of cutting length of ties column
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
Wat is meant by Aecron brick?
how to calculate freeboard in under ground water tank and technical details
Define What is Civil Engineering?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
what is labour consume factor in residential projects
how much required strength of cement concrete bricks(size 230x115x75mm)
Mention different types of roof systems?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?