Answer Posted / abdullah
if structure is rcc then cement will be 380 kg . means no of
bag is 7.6.
for pcc then cement will be 360kg. means no. of bag is 7.1.
according to this u can find the quantity of water
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
What is the density of most of construction materials?
what is the dimensions of river sand truck trailer or trolly ?
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
what is called Bulk Density of aggregate?
Define Workability ?
Describe Briefly The Various Methods Of Concrete Curing?
What is meant by dimensioning?
How to calculate steel for beam slab and column
What are the phases inspections are done by local authority while construction?
How to hide dimensions in autocad?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance