Answer Posted / samyak jain
The Process of plastering is that Throw 1 trovel filled with
material on to the wall must me at the distance of 20 to 30
cm far from the wall so that each n every particle get
bounded/sticked with the wall. And the trovel must be
partialy filled with mortar.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
In the roof of a pumping station explain briefly the components of a waterproofing system?
How much is the cover for slab?
how is the reinforcement is distributed in triangular slab
Why does the pressure increase under soil?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
what's the formula for calculate pcc for matt(45mm aggregate)?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
how many type of admixtures for water stored structure?
explain fie benefits of using standard terminology in the measurement process