what is plum concreting and how is it can be done what is the
ratioo of rubble and concrete
Answer Posted / azam
40% - rubble
60% - concrete
Generally it's done in flat footing foundation by placing the rubble and concrete as mention above ratio without and gape between them.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
how to design and calculate materail quantity for concrete speedbreaker ?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
What does a construction cost covers and what does not?
Floor tile measurement? Wall to wall or skirting to skirting
Gidc technical que paper
how many tonnes equals to one cubic feet?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What tor stands for in tor steel?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
sir, whitch is the best book (writer name) for prepration of gate....
how much shouid be the rate for ready mix concrete per cubic meter
natucher of concrete &type of concrete?