Hi guys,

Design job sequence,
we have 3 sources, in that 1st source in abort then only run
the remaining sources..
How please design the job.

Thanks.

Answer Posted / ankit gosain

Hi All,

Create three job acitivities like:


JobActivity1-------->JObAcitivity2
|
|
|
JobActivity3

Now, double click on JobActivity1, and go to the trigger
tab, make the expression type for both the JobActivity2 &
JobActivity3 as failed - (Conditional).
Then both the jobs will run if and only if when the first
job will get aborted.

Cheers,
Ankit :)

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is size of a transaction and an array means in a datastage?

727


What is apt_config in datastage?

695


how to run a sequential file stage in parallel if the stage is used on the TARGET side

1126


How do you generate sequence number in datastage?

617


what are the devoleper roles in real time? plz tell i am new to datastage....

1630






Distinguish between informatica & datastage. Which one would you choose and why?

574


What are the difference types of stages?

613


how to read 100 records at a time in source a) hw is it fr metadata Same and b) if metadata is nt same?

1710


Differentiate between Symmetric Multiprocessing and Massive Parallel Processing?

612


How to reverse the string using SQL?

881


What is a merge?

661


i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu

2264


Name the different sorting methods in datastage.

604


What are the benefits of datastage?

718


What is the use of hoursfromtime() function in transformer stage in datastage?

578