Hi guys,
Design job sequence,
we have 3 sources, in that 1st source in abort then only run
the remaining sources..
How please design the job.
Thanks.
Answer Posted / ankit gosain
Hi All,
Create three job acitivities like:
JobActivity1-------->JObAcitivity2
|
|
|
JobActivity3
Now, double click on JobActivity1, and go to the trigger
tab, make the expression type for both the JobActivity2 &
JobActivity3 as failed - (Conditional).
Then both the jobs will run if and only if when the first
job will get aborted.
Cheers,
Ankit :)
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is size of a transaction and an array means in a datastage?
What is apt_config in datastage?
how to run a sequential file stage in parallel if the stage is used on the TARGET side
How do you generate sequence number in datastage?
what are the devoleper roles in real time? plz tell i am new to datastage....
Distinguish between informatica & datastage. Which one would you choose and why?
What are the difference types of stages?
how to read 100 records at a time in source a) hw is it fr metadata Same and b) if metadata is nt same?
Differentiate between Symmetric Multiprocessing and Massive Parallel Processing?
How to reverse the string using SQL?
What is a merge?
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
Name the different sorting methods in datastage.
What are the benefits of datastage?
What is the use of hoursfromtime() function in transformer stage in datastage?