Hi guys,
Design job sequence,
we have 3 sources, in that 1st source in abort then only run
the remaining sources..
How please design the job.
Thanks.
Answer Posted / ankit gosain
Hi All,
Create three job acitivities like:
JobActivity1-------->JObAcitivity2
|
|
|
JobActivity3
Now, double click on JobActivity1, and go to the trigger
tab, make the expression type for both the JobActivity2 &
JobActivity3 as failed - (Conditional).
Then both the jobs will run if and only if when the first
job will get aborted.
Cheers,
Ankit :)
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What are the job parameters?
What is the process of killing a job in datastage?
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
project Steps,hits, Project level HArd things,Solved methods?
What is the difference between passive stage and active stage?
what is the use of materialized view?
How a server job can be converted to a parallel job?
What is the sortmerge collector?
What are the different types of lookups in datastage?
Differentiate between operational datastage (ods) and data warehouse?
What is a merge in datastage?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
what is flow of project?
Can we use target hash file as a lookup ?
How do you import and export data into datastage?