Hi every one, I am Suneel.
I/p o/p
--- -----
suneel suneel
suneel
suneel
suneel
suneel
how it will get.
Please design job with explain.
Thanks.
Answer Posted / ankit gosain
Hi All,
Well you can create a job with O/P file in Append mode,
like:
I/P Seq file----->O/P Seq file
and use it under a Sequence Activity with Start Loop and
End loop activity like.
Start Loop---->Sequence1---->End Loop
| |
|-------------------------|
Start Loop properties:
---------------------
From=1
to=5
Spet=inc
In this way the job will be executed for the 5 times and
you will get the desired O/P.
Cheers,
Ankit :)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Which algorithm you used for your hashfile?
Can you implement SCD2 using join, transformer and funnel stage?
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
What is job control?
What are the different types of lookups in datastage?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
What are the stages in datastage?
How many types of stage?
Why do we use exception activity in Datastage?
what is the difference between == and eq in UNIX shell scripting?
what is flow of project?
Differentiate between validated and Compiled in the Datastage?
Name the different sorting methods in datastage.
How many types of views are there in a datastage director?
How to create a file using vi editor? 2)how to delete a file in vi editor? 3)How to connect the server datastage to unix? what r the command lines we r using? 4)30 jobs r runnig in unix i want to find out my job. how to do this? give me command?