Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Hi every one, I am Suneel.

I/p o/p
--- -----
suneel suneel
suneel
suneel
suneel
suneel

how it will get.
Please design job with explain.

Thanks.

Answer Posted / ankit gosain

Hi All,

Well you can create a job with O/P file in Append mode,
like:

I/P Seq file----->O/P Seq file

and use it under a Sequence Activity with Start Loop and
End loop activity like.

Start Loop---->Sequence1---->End Loop
| |
|-------------------------|

Start Loop properties:
---------------------
From=1
to=5
Spet=inc

In this way the job will be executed for the 5 times and
you will get the desired O/P.

Cheers,
Ankit :)

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which algorithm you used for your hashfile?

1233


Can you implement SCD2 using join, transformer and funnel stage?

1604


In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?

1554


What is job control?

1198


What are the different types of lookups in datastage?

1107


create a job that splits the data in the Jobs.txt file into four output files. You will direct the data to the different output files using constraints. • Job name: JobLevels • Source file: Jobs.txt • Target file 1: LowLevelJobs.txt − min_lvl between 0 and 25 inclusive. − Same column types and headings as Jobs.txt. − Include column names in the first line of the output file. − Job description column should be preceded by the string “Job Title:” and embedded within square brackets. For example, if the job description is “Designer”, the derived value is: “Job Title: [Designer]”. • Target file 2: MidLevelJobs.txt − min_lvl between 26 and 100 inclusive. − Same format and derivations as Target file 1. • Target file 3: HighLevelJobs.txt − min_lvl between 101 and 500 inclusive. − Same format and derivations as Target file 1. • Rejects file: JobRejects.txt − min_lvl is out of range, i.e., below 0 or above 500. − This file has only two columns: job_id and reject_desc. − reject_desc is a variable-length text field, maximum length 100. It should contain a string of the form: “Level out of range: ”, where is the value in the min_lvl field. My Question is how do you write the stage variable for reject rows.

2776


What are the stages in datastage?

1137


How many types of stage?

1227


Why do we use exception activity in Datastage?

1371


what is the difference between == and eq in UNIX shell scripting?

1558


what is flow of project?

2057


Differentiate between validated and Compiled in the Datastage?

1356


Name the different sorting methods in datastage.

1101


How many types of views are there in a datastage director?

1340


How to create a file using vi editor? 2)how to delete a file in vi editor? 3)How to connect the server datastage to unix? what r the command lines we r using? 4)30 jobs r runnig in unix i want to find out my job. how to do this? give me command?

2665