Hi every one, I am Suneel.
I/p o/p
--- -----
suneel suneel
suneel
suneel
suneel
suneel
how it will get.
Please design job with explain.
Thanks.
Answer Posted / ankit gosain
Hi All,
Well you can create a job with O/P file in Append mode,
like:
I/P Seq file----->O/P Seq file
and use it under a Sequence Activity with Start Loop and
End loop activity like.
Start Loop---->Sequence1---->End Loop
| |
|-------------------------|
Start Loop properties:
---------------------
From=1
to=5
Spet=inc
In this way the job will be executed for the 5 times and
you will get the desired O/P.
Cheers,
Ankit :)
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
options available in sequence job to run,validate?
Have you used Unstructured data?
what are the errors,warnings in datastage
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
How one source columns or rows to be loaded in to two different tables?
A signal has a wavelength of 1 micro min in air.how far can the front of the wave travel during 1000periods?
What are the different types of lookups in datastage?
project Steps,hits, Project level HArd things,Solved methods?
explain about completely flow of sequencers technicaly,without using example??explain about lookup,nullhandling?
Could anyone give brief explanation bout datastage admin
how to implement scd2 in datastage 7.5 with lookup stage
What is the difference between Datastage 7.5 and 7.0?
How to RD using transformer?
What are the types of containers and how to create them?