Answer Posted / jothi
75 and 100 ºF (24 and 38 ºC) Asper (ACI 305-99)
| Is This Answer Correct ? | 25 Yes | 2 No |
Post New Answer View All Answers
What is Architect-Prepared Contract?
What do you meant by gui?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
What is the use of mirror command?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
material used for mendrel use to bend epoxy coated rebar
Minimum concrete cover in slabs, columns, beams, foundation and other st?
how to calculate the scour depth
What is reinforced concrete?
What are the problems one might face while having a Cantilever balcony?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
Describe the various methods of concrete curing?
What is alternate bid?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?