Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What will happen if i connect two 3-phase tranformers
secondary supply on one bus bar that is R-Y-B-N?

Answer Posted / pabba praveen

Voltage ratio, polarity and phase sequence of both the
transformers should be same for parallel operation Relative
phase displacement between the two transformers should be
zero. Load will be shared based on the percentage impedance
of the transformer.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

IF TVM OF TRANSFORMER SHOWS POWER FACTOR ON 33 KV SIDE AS 0.97 LAGGING AND ON 132 KV SIDE IS 0.75 LEADING.IS THIS CORRECT.WHERE IS PROBLEM.

2296


1.Can we use 6.6/11KV 300sq mm xlpe 3core cable for LT use (415 Volt). 2. If we use it for LT then what is the current rating

1697


What is UPS and How do you maintain the UPS Maintenance? Brief Description on UPS maintenance.

2538


State uses of different types of stsrters with different capacities of motors as below: a. up to 5HP b. above 5hp to 10hp c. above 10hp to 20hp d. above 20hp

2023


-How do you select cable size for a given load at a given distance from source of supply. How do you find voltage drop.

1745


An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The slip when motor stalls is A 1 B 0 C 13.33% D 10.33%

1850


comparision between ACB and VCB

2305


How two nos. 130 kw D.C motor get synchronise using D.C drive.

2047


what parameters are should nessary for control technic dc drive(in rolling mills)?

1920


can anybody send me syllabus of rrb section engg (electrical). and also send previous question pepar...

1940


for opening electrical shop, tips needed.

1778


difference between the applicability of nortons and thevenin theorem

2035


what is the purpose of silicon dropper used in battery charger?

7366


How much load can take a 16 mm aluminum cable 3 phase

1699


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739