Answer Posted / umair naqvi
plZ plz plz send me civil placement paper
(smumairnaqvi@ymail.com)
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What is the cost difference between site mix and ready mix concrete per cubic meter
Why is concrete cube test carried out?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
Which are the top apps for you civil engineering?
pls give me some basic informations in construction of a structure?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
how can we calculate steel value, depending on load
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What is meant by scaffolding coefficient?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
what is thumb rule for calculating the size of ISMB required for a particular length of span
what is the dimensions of river sand truck trailer or trolly ?
What is meant by engineering drawing?
what is idealized curve for concrere and steel