Providing and constructing 150 mm thick brick masonry with
brick in cement mortar ( 1:4 ) in partition walls, pilars,
pedestals,supports etc. at all floors including RCC band at
1.0 M intervals, including scaffolding racking out joints
and watering cleaning complete in sqm.
Providing and constructing 230 mm thick brick masonry in Cum
Providing and constructing 460 mm thick brick masonry in Cum
Please provide me the rates..
Answer Posted / rustam jamal
230mm thick Wall = Rs. 4455/- per Cum
460mm Thick Wall = Rs 4455/- Per Cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Name the main components of a cad gui?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
explain what do you mean by the property development.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
How many square meter can a worker/labor demolish a structure per day?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
What is unit weight of normal concrete?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
may i know the detailed description of cutting length
what is E
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
in one SQM plaster how much Cement and sand consumed in ratio 1:4