how much binding wire required per tonne slab beam columns

Answer Posted / deep dubey

7 kg/mt bindinng wire is required.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the calculation of raw material for 0.35cum of m-15

1035


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1037


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4573


How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete

1267


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

772






For what building Built-on balconies are preferable? What are the advantages?

714


What is M40 _ TOR - EQ and B.F.S

2017


questions with answers to face an interview of an civil engineer regarding RCC buidings

2151


How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

1003


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

1811


What is the Maximum %age of Steel in columns and beams ?

717


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1909


what is column foundation

1829


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5787


What is the force exerted by the tacoma narrows bridge?

729