What is the correct procedure to shutdown VCB in 11kv
substation.safety and work procedure
Answer Posted / balaji
1. Preparation (Permit to work)
2. Separation (Trip the Breaker)
3. Isolation (Isolator isolates)
4. Earthing & Short circuit (Earthing)
5. Screening & Marking the area (Barricading the work area)
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
at what rate the micro controller increment its timer....is it 1micro seconds or 1/(12*10^6) seconds
by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.
why the NGR (neutral grounding resistor) always OFF during DG off?
I am having a 1500 KVA transformer whose secondary current is 2086A and my connected load is 1000 KVA, I am having 400 KVAR APFCR for PF improvement what ratio of CT should i install in LT EB Bus to get optimum PF improvement?
What are the protections for safe running of electric generator?
WHY EARTHING NOT NEEDED IN BATTERY IN SUBSTATION
fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be
what is the efficiency of thyristor
What is transmittance?
write a program that prints prime numbers from 1-20 in digonal form
what is your aim
if negative of DC supply used and positive is grounded through EGB, and if ELCB used in the system then is it sense the positive volatge and get tripped is it possible?
What is mean by hot and cold loop testing?
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?
1. Can a 12v DC choke operate a 60v/12w PL lamp ? 2. Can a 230v ballast fire / operate a 60v/12w PL lamps.