how much binding wire required per tonne slab beam columns

Answer Posted / shriiwas

10 to 12 kg. / ton

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to come 1.54 from dry to wet concrete? 

1813


Questions related to civil.engg in company

1569


Why are separation membranes used between concrete pavement slab and sub-base?

817


What does civil status mean?

677


What are segregation and bleeding?

684






to minimize budget cost of building , what can i do

1652


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2077


How will you reduce the concrete flow after mixing the concrete

1717


how many shuttering material required for 1000 sq.m built up area.

1866


Define What is a kip?

720


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2016


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2306


Explain major differences between routing maintenance and major maintenance.

652


how do you stabilize a waterlogged area in road construction

6299


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1683