how to calculate Amp, 2 different Amp of batteries?
Example:
No. of Batteries = 2
Battery voltage = 12V
1st Battery rating = 17AH
2nd battery rating = 30AH
between parallel connection then output volt
12v
Amp?
Answer Posted / simon peter
In parallel connection output will b 12v 47ah.....
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Do any one know exacatly when the results for NHPC held on 8th march 09 for engineering trainees will be released ?. if so please post it, i'm eager to know it.
What is the permissible maximum flux density in transformer core?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?
What is the unit of attenuation?
CAN U PLEASE TELL ME SOME G.D TOPICS FOR APGENCO INTERVIEW&G.D
what will happens if one phase is missing for 33/11kv power transfomer and why?
what is the use of expulsition protective gap in 11Kv line.
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
surge tank, hrc fuse, earthing transformer, firm power objective type
what is difference between 5A and 100A CT constructional wise and operation?
Which device is used for the source of emission of electrons in a crt?
What type interview questions ask in Electrical technicians
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?