How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / baldeo m. sarwe
Yes this formula is near abovet is correct
| Is This Answer Correct ? | 27 Yes | 10 No |
Post New Answer View All Answers
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
what are the code used for residental building?
what are the types of design? which type of method is used at what type of design & why?
How to compute minimum number of columns required for a site from area of site?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
What is a hatch patterns?
What are your future hopes for this job?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
Explain major differences between routing maintenance and major maintenance.
How to calculate unit weight of concrete for m40 grade.
Concrete cover for slab, column, beam and footing?
what is floating slab foundation?