What is meant by 'zero value' in quantity surveying.
Answer Posted / irfan vadla
zero value is starting value which define certain calculation of quantity surveying
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Why nautical mile is different from statute mile?
What is an ice dam sock?
What is limit state method and working stress method and ultimate method
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to calculate quanty of steel in four leg stirrups?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
How is improve my knowledge in construction industries....
Rate analysis of Vitrified tile in cement mortor 1:3
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)