In any plant or substation main incommer voltage RY - 415
V,YB - 400 V, BR - 387 V(in commer feed from transformer 11
Kv /0.415 KV) why found voltage differance in each phase?
plant have not self power plant it is depend on outsource
grid
Answer Posted / kj
First check the 11kv is correct. If the 11kv is different
on each phase the LT side will also be different.
If 11 kv is OK and the voltage is different on no load the
fault is in transformer as answer above.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
Why using synchronising methed in DG's sets?
how pt is using
Why an ac solenoid valve attract the plunger even though we interchanges the terminal? Will the poles changes?
Difference between a pilot wire and a normal conductor?
how could we calculate the no of outgoings from a 800 watt distribution board
what is difference between cpp electrical system and refinery electrical system
what is thresold of perception
xfhnchncv?
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt
how tto ingress mw in turbine explain.procedure ?
in battery charging room we find two fuses (one in positive other in negative cables ).why it is so?one fuse is ore than sufficient?
advantage and disadvantage of team work?
which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?