how is the wastage component in structural steel being
considered while doing the reconcillation for the
fabrication with returning of scrap under 1 meter length

Answer Posted / athiyan

U are saying indian standards. In which code it is given??

Is This Answer Correct ?    6 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

1745


difference between fc and fc'?

1303


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2605


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1485


How to find out kg per Sft ?

1795






what is w/c ratio in dry lean concrete for m10 mix design

7970


how clculate excavated or backfilling quantity by simpson's rule

4728


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2400


about higyway engineering

3545


What are the strongest shapes in building?

646


foundation details for 25 ton weight Furnace on 2 supports and 2 tilters

1099


I am called for interview from north east power plant .so, I need some interview question which may help me.

1245


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2845


What is the effect of a building collapse?

616


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2385