Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / vishal
3.14X.150X.150X10.00= .7065 M3
| Is This Answer Correct ? | 11 Yes | 22 No |
Post New Answer View All Answers
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
where can i get the previous question papers for rrb section enginerr (civil)
What is the difference between chamfer and fillet?
for pretensioning which will yield first and same for post tensioning?
how to clculate the %of concrete strenght achive after curing?load
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
how pumping of concrete effects the quantity of material used in it?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
What is the distance between railway tracks?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
How do you prepare Material Recovery Statement for deduction from contractors bills?