What is Fly Ash & Admixture & What is the purpose of mixing Fly Ash & Admixture to Design Mix? Tell the name of commonly used Admixtures
Answer Posted / sha
fly ash and admixer incresing the setting time of
concrete.name-basf,fosrock
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what is the tensile strength of 10swg and 8swg gabion wire?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
How is calculate the cube molt
How to calculate chejja reinforcement
Which are the top apps for you civil engineer?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
Would you cause a 55-gallon drum of water to weigh more by climbing in?
How to design staircase.plz tell me formula for the design the staircase.
Sir how to find cutting length for footing steel bars in the shape of "u"
How much material is required for constructing a 2 Lane 2Km rigid pavement road
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.