IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / surjya
1)Working stress method is only available upto hooks law..i.e stress is directly proportional to strain..but in nature no matters are totally elastic in nature and does not obeys hooks law...so we introduced a new LIMIT STATE METHOD where u can design beyond the elastic limit upto plastic limit... 2)In working stress method the design is done for any structural element upto uncertain durability but in limit state the durability is limited and safe.
3)Material;time;cost of construction more in working stress....so its too much less efficient than Limt state method.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
All aptitude question of Bechtel
What is soil enforcement?
Define What is the distance between railway tracks?
What is the likely strength of a 1:2:4 concrete mix?
what is right & short method of measurement of slab&beam
Slump Values for works?
What is the Null Point of chimney in Power Plant
how is the reinforcement is distributed in triangular slab
The portion of a brick cut across the width is called?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Explain major differences between routing maintenance and major maintenance.
explain the advantages of total stasion
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
sir how can we find the cement and sand required for making 4" drop