Answer Posted / chenny
why we want to go for uneconomical beam section by providing this much of big span and uneconomical quantity of concrete required for a small 15000L water tank.
by this we can save much higher floor area.
we need to use only 6.25m2
simply we can provide an economical dimension
2.5x2.5x2.5m
length of tank=2.5m
breadth=2.5m
height of tank=2.4+(0.1m as dry board)
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the quantity of cement in mix m20 concrete?
Describe the advantages and disadvantages of using plastic and timber fenders?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
why we use 19x9x9and 20x10x10 but not other
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
why we can use dust in concrete insted of fly ash
Who name us Engineer & Why?
how can calculate cutting length of diamond ring
What is meant by a context menu in a cad software?
What is missing report and how to prepare
Explain what is alternate bid?