What are mandatory fields for PP configuration
Answer Posted / ajit1983
1.OPPQ-Plant Parameters
2.OPPR-MRP Parameters
3.OPJH-Creation of order type
4.OPL8-Order type dependent parameters
5.OPKP-Scheduling profile
6.CO82-Assign number ranges for orders
7.OPJ8-Control key parameters
8.OPK4-Conformation parameters
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Define gaps.
what do you mean by planning time fence
What is meaning of customized reports?
What is a ‘bom’?
What is group bom?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is scope of planning?
Explain PI sheet.
What is MRP procedure
What is the need of mrp list if the stock requirement list is already given?
Can we create production order without bom and routing ?
What are all the ‘technical types of bom’?
What is Individual and collective requirements and differecne between them in MTO scenario?
what do you mean by opening periods
What is 'capacity planning'?