why transformers are put with supply for 24 hours before
giving supplying to a locality?
Answer Posted / aluko
it is to allowed the rush current to induce maximum flush in to the field for stability so that there will be not fluctuation in supply voltage to the locality due to in rush currents.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the method to solve circuit using source transformation?
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)
in basic 2 phase will short means tripping the power but spot welding 2 phase shorting but not tripping it will welded why.....(Q)
what transformer we used normally and upto which kva?
Can we indroduce the principle of single phase induction mator to Transformer? i.e. by Producing rotating flux in the transformer.
What technology is used in latest generators?
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
why current is constant on d.c?
What is the function of a neutral reactor.
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.
What Should be the value of Vector Surge angle at Tripping and how to calculate it?
What is a DC series motor?
why magnet has north and south poles only why not east and west and why we are considering as north and south poles? why cant we consider as east and west?
At what speed 1 HP motor can run an electric car of weighing 400 kg?
Can we use Ccapacitive voltage transformer directly for metering purpose?